| WBS | TASKS | Personnel | E C | Start Date | End Date | % Comp | |||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1 | NISM/MISM | ||||||||||||
| 1.1 | Mechanics | ||||||||||||
| 1.1.1 | (Ball) Bearing | ||||||||||||
| 1.1.1.1 | Design | pgc | 23-9 | 2-10 | 0% | ||||||||
| 1.1.1.2 | Manufacture | w/s | 2-10 | 9-10 | 100% | ||||||||
| 1.1.1.3 | Temperature Test | pgc mgh | 9-10 | 24-10 | 100% | ||||||||
| 1.1.1.4 | Improve & debug | pgc | 24-10 | 11-11 | 100% | ||||||||
| 1.1.2 | Rectangular Mirror Mounting | ||||||||||||
| 1.1.2.1 | Design | pgc | 23-9 | 29-9 | 100% | ||||||||
| 1.1.2.2 | Manufacture | w/s | 1-10 | 8-10 | 100% | ||||||||
| 1.1.2.3 | Mounting Temperature Test | pgc/mgh | 8-10 | 18-10 | 100% | ||||||||
| 1.1.2.4 | Install | pgc/mgh | 22-10 | 16-11 | 100% | ||||||||
| 1.1.3 | Circular Mirror | ||||||||||||
| 1.1.3.1 | Mounting design | pgc | 19-9 | 25-9 | 100% | ||||||||
| 1.1.3.2 | Mounting manufacture | pgc | 1-10 | 13-10 | 100% | ||||||||
| 1.1.3.3 | Mounting temperature test | pgc | 13-10 | 29-10 | 100% | ||||||||
| 1.1.4 | Sealing | ||||||||||||
| 1.1.4.1 | Test | pgc | 15-10 | 28-10 | 100% | ||||||||
| 1.1.4.2 | Procurement | jre | 29-10 | 7-11 | 100% | ||||||||
| 1.1.4.3 | Debug | pgc | 5-11 | 13-11 | 100% | ||||||||
| 1.2 | Optics | ||||||||||||
| 1.2.1 | Rectangular Mirrors | ||||||||||||
| 1.2.1.1 | Order | jre | 24-9 | 28-9 | 100% | ||||||||
| 1.2.1.2 | Installation | pgc | 1-10 | 11-11 | 100% | ||||||||
| 1.2.2 | Filters | ||||||||||||
| 1.2.2.1 | Clean / repair | pgc | 18-9 | 25-11 | 87% | ||||||||
| 1.2.2.2 | Remount | pgc | 27-9 | 1-12 | 100% | ||||||||
| 1.3 | Electronics | ||||||||||||
| 1.3.1 | Chopper | ||||||||||||
| 1.3.1.1 | Debug | map | 25-9 | 16-10 | 100% | ||||||||
| 1.3.1.2 | Incorporate design changes | map | 16-10 | 24-10 | 100% | ||||||||
| 1.3.1.3 | Install | map | 11-10 | 2-11 | 100% | ||||||||
| 1.3.1.4 | Test | map | 2-11 | 25-11 | 100% | ||||||||
| 1.3.2 | Controller racks | ||||||||||||
| 1.3.2.1 | sub-rack rebuild | map | 29-9 | 25-10 | 100% | ||||||||
| 1.3.2.2 | sub-rack test | map | 26-10 | 3-12 | 95% | ||||||||
| 1.4 | Software | ||||||||||||
| 1.4.1 | Control Software upgrade | ||||||||||||
| 1.4.1.1 | Design | mcba | 4-10 | 8-10 | 100% | ||||||||
| 1.4.1.2 | Code | mcba | 8-10 | 10-11 | 100% | ||||||||
| 1.4.1.3 | Test | mcba | 11-11 | 3-12 | 91% | ||||||||
| 1.5 | Assembly, Integration & Test | ||||||||||||
| 1.5.1 | MISM | ||||||||||||
| 1.5.1.1 | Mirror box | pgc | 30-10 | 3-11 | 100% | ||||||||
| 1.5.1.2 | Detector box | pgc | 4-11 | 9-11 | 100% | ||||||||
| 1.5.1.3 | Overall mechanical assembly | pgc | 9-11 | 13-11 | 100% | ||||||||
| 1.5.1.4 | Electronics and cabling | map | 13-11 | 17-11 | 100% | ||||||||
| 1.5.1.5 | Test | 17-11 | 2-12 | 94% | |||||||||
| 1.5.2 | NISM | ||||||||||||
| 1.5.2.1 | mirror box | pgc | 30-10 | 4-11 | 100% | ||||||||
| 1.5.2.2 | detector box | pgc | 5-11 | 9-11 | 100% | ||||||||
| 1.5.2.3 | Overall mechanical assembly | pgc | 9-11 | 13-11 | 100% | ||||||||
| 1.5.2.4 | 13-11 | 17-11 | 100% | ||||||||||
| 1.5.2.5 | electronics and cabling | map | 17-11 | 2-12 | 94% | ||||||||
| 1.6 | Tests | ||||||||||||
| 1.6.1 | MISM | ||||||||||||
| 1.6.1.1 | Sealing test | pgc | 20-10 | 25-10 | 100% | ||||||||
| 1.6.1.2 | Detector cooler test | mgh | 25-10 | 30-10 | 100% | ||||||||
| 1.6.1.3 | Optical alignment | jre | 30-10 | 4-11 | 100% | ||||||||
| 1.6.1.4 | Filter Wheel | jre | 4-11 | 11-11 | 100% | ||||||||
| 1.6.1.5 | electronics/software | mcba | 23-10 | 4-11 | 100% | ||||||||
| 1.6.1.6 | cold temperature (up to -40°C) | pgc | 4-11 | 13-11 | 100% | ||||||||
| 1.6.1.7 | debugging | pgc/mgh | 13-11 | 23-11 | 100% | ||||||||
| 1.6.2 | NISM | ||||||||||||
| 1.6.2.1 | Sealing test | 18-11 | 29-11 | 100% | |||||||||
| 1.6.2.2 | Detector cooler test | mgh | 27-10 | 7-11 | 100% | ||||||||
| 1.6.2.3 | Optical alignment | jre | 7-11 | 17-11 | 100% | ||||||||
| 1.6.2.4 | electronics/software test | mcba | 17-11 | 27-11 | 100% | ||||||||
| 1.6.2.5 | cold temperature test | pgc | 17-10 | 16-11 | 100% | ||||||||
| 1.6.2.6 | debugging | All | 17-11 | 29-11 | 100% |